Problems with tutorial 1
Posted: Sun Nov 01, 2015 2:09 pm
Hello, plz. don`t hit me, but I don't know where I should open this trad.
I have Problems with tutorial 1.2, where I should vary the distance from 1..2 bohr. Hence vary xcart. I don't know if I already made a mistake in filenames or storage past.
I crated a new Work1_2 in Work and copied the files: tbase1_x.files, tbase1_2.in and tbase1_2.out. Then I chanced the filenames in tbase1_x.files. And I tried to implement an arithmetic series like described for ecut: ndtset 6 ecut: 10 ecut+ 5 so for cat I estimated maybe
ndtset 20
xcart: -0.5 0.0 0.0 0.5 0.0 0.0 xcart+ 0.025
I know this must be wrong but I have no idea how to do??
thx
maths
I have Problems with tutorial 1.2, where I should vary the distance from 1..2 bohr. Hence vary xcart. I don't know if I already made a mistake in filenames or storage past.
I crated a new Work1_2 in Work and copied the files: tbase1_x.files, tbase1_2.in and tbase1_2.out. Then I chanced the filenames in tbase1_x.files. And I tried to implement an arithmetic series like described for ecut: ndtset 6 ecut: 10 ecut+ 5 so for cat I estimated maybe
ndtset 20
xcart: -0.5 0.0 0.0 0.5 0.0 0.0 xcart+ 0.025
I know this must be wrong but I have no idea how to do??
thx
maths